Assemble the mechanics

Step 1: Attach base to stand

Lay the base and stand on their side as shown. The stand is attached to the base with 4 x M3 self-tapping posi head screws 16 mm.

Step 2: Attach main body to base, with springs under adjustment arms

First remove the printed brims on the ends of the adjustment arms of the main body as highlighted below.

Stand the base and stand upright. Then stand 4x Stainless steel compression springs, 0.5 mm wire, 20 mm length, 6 mm diameter into the circular recesses in the base as shown.

*** image of standing springs

Carefully lower the main body onto the base as shown so that the circular cavities under the adjustment arms capture the top of the springs without knocking them over. Then screw the main body to the base with 9 x M3 self-tapping posi head screws 12 mm.

Screw in the 4 x M3 self-tapping hex socket cap screws 25 mm, first placing 1x M3 washers under each of the screw head. These are the lead screws of the adjustment arms, one on each adjustment arm. Do not fully tighten. Screw them in so that the adjustment arms are horizontal and the xy flexure stages are centred.

Step 3: Attach fluidics cart to stand

Working underneath the instrument, you may lay the instrument on its side again if you find it easier. The fluidics cart is attached to the stand with 4 x M3 self-tapping posi head screws 8 mm.

Instrument mechanics assembled

Your instrument should now look like this. 2 flexure xy stages should be adjustable with 4 lead screws.

Now move on to assemble the fluidics!