Assemble the fluidics
Step 1: Assemble flow cell
Caution
Take care not to damage sealing surfaces (barbs, o-ring grooves, o-rings, cuvette ends). Use plastic tweezers when holding o-rings (not fingers or metal tools).
Wear gloves to handle the cuvette: don't contaminate it with fingerprints.
First remove the printed supports from the flow cell. Take care not to damage the barb connectors.

Second, insert the o-rings at either end within the o-ring grooves. If handled gently, the o-rings should stay inside the grooves, due to a slight printed overhang.
Thirdly flex the flow cell slightly as shown below to insert the cuvette between the o-rings. Tip: if using a square cuvette, you should be able to see through the cuvette side (with a magnifying glass) that the o-ring is sealing against the surface.
The flow cell accepts either a 4-mm round thick-walled capillary or a 4-mm square section cuvette. The round capillary has higher performance in fluorescence collection (less total internal reflection), but the cuvette has higher performance in FSC/SSC (lower scattering as the beam enters and exits the quartz).

Fourthly attach 120 mm of Silicone tubing 2 mm OD 1 mm ID to the waste barb on top of the flow cell, and thread this tube through the duct on the side of the flow cell so it sticks out of the bottom.

Note how the flow cell works and how it will interface with the optics. Inside the flow cell is a sheath flow chamber with concentric sheath and sample inputs. The laser beam enters and leaves through opposite faces of the cuvette, with fluorescence (and SSC) collected by a condensing lens at 90 degrees, and a camera viewport for alignment opposite the condensing lens.

Step 2: Prepare sheath and waste tank caps
The caps of the sheath and waste tanks must first be drilled with the right size holes to fit the required tubing connections.
Note that the sheath flow is pulled by a vacuum on the wate bottle. Take care therefore to drill cleanly, especially the waste tank cap, as these holes must seal against a vacuum after fitting with connectors and tubing as follows.
Sheath tank cap:
- 5 mm hole (sheath tube),
- 1.5 mm hole (vent)
Waste tank cap:
- 3.5 mm hole (vacuum pump)
- 3.5 mm hole (pressure sensor or vent)
- 3 mm hole (waste tube)
Attach the following fitings and tubing to the caps, threading them from inside the cap as follows:
Sheath tank cap:
- Bottom-of-bottle filter + 250 mm of Silicone tubing 6 mm OD 4 mm ID; pass through 5 mm cap hole from inside to outside, then add Tube barb union 2.4x6.4.
Waste tank cap:
- For waste stream: 50 mm of Silicone tubing 2 mm OD 1 mm ID + Tube barb union 1.6x2.4; pass through 3 mm cap hole from inside to outside, then add 480 mm of Silicone tubing 2 mm OD 1 mm ID.
- For pressure sensor or vent: Tube barb union 1.6x3.2 + 400 mm of Silicone tubing 3.2 mm OD 1.6 mm ID; pass through 3.5 mm cap hole from inside to outside.
- For vacuum pump: Tube barb union 1.6x3.2 + 400 mm of Silicone tubing 3.2 mm OD 1.6 mm ID; pass through 3.5 mm cap hold from inside to outside.
In the waste tank cap, push the tube barbs from the inside into the holes in the cap so that they seal. Screw the caps on both bottles. You can then put 2x cable ties on the bundle of tubing coming out of the waste bottle at 50 mm intervals to keep them tidy.

Step 3: Prepare and assemble sample loader
The sample loader is a linkage of several mechanical bodies that are printed in a single piece. Before using, it must be loosened and lubricated.
To loosen the hinges, apply pressure to the two sets of adjacent hinges as shown. The outer hinges down and the middle hinge up. Alternate between the two sets. If printed well, very little pressure applied with the fingers should be required to loosen the hinges. Once the linkage is loose, add light lubricating oil to the hinges. Then work the linkage back and forth repeatedly until it can move with very little friction.

Attach the two sample loader range limiters to the holes as shown using 2x M3 self-tapping posi head screws 8 mm.
Attach the sample loader retaining spring (Stainless steel extension springs, 0.3 mm wire, 20 mm length, 6 mm diameter) with a 1x M3 self-tapping posi head screws 8 mm.

Finally, check that the SIP tube will fit in the sample loader: you may need to carefully ream the hole with a 1.6 mm drill bit. The SIP tube is a 78 mm length of Peek tubing 1.6mm OD 0.25mm ID. Cut the required length, straighten it if it was supplied curved, and gentle push it into the hole provided.

How the sample loader works
The sample loader is based on a Kempe Kite Inversor 2 which is a parallel line linkage: it allows a single degree of freedom, while keeping the SIP and sample tube parallel to each other.

Step 4: Prepare sample (peristaltic) pump assembly
First fit the barb connectors to the peristaltic pump tubing.
Help Block
if no barb connectors were supplied with your pump, these can be substituted with 10 mm sections of PEEK tubing 1.6mm OD 0.25mm ID.
If building the Cytkit 2S-14F, fit the stepper motor connector board to the pump, and ribbon cable to the stepper motor connector board.
Then fit the following tubing to the sample pump:
- For flow cell sample inlet: 20 mm of Silicone tubing 2 mm OD 1 mm ID.
- For SIP tube: 55 mm of Silicone tubing 2 mm OD 1 mm ID.
- SIP tube itself (as described above).

Step 5: Prepare sheath (vacuum) pump assembly
If building the Cytkit 1S-1F configuration, first cut 2 x 200 mm wires for positive and neutral connections to the vacuum pump. Solder on end of each to the vacuum pump terminals. Leave the other ends as bare wire to connect to the screw terminals of the motor controller.
If building the Cytkit 2S-14F configuration, the vacuum pump is already supplied with the correct length of wires and a connector to attach to the main board
Place the pump body in the sheath pump holder (flexible printed part). Then cut 90 mm of Silicone tubing 6 mm OD 4 mm ID and put on the end a Tube barb union 2.4x6.4.

Step 6: Attach tubing to flow cell
Now attach the following:
- The flow cell sample inlet barb to the open tubing on the sample pump.
- A barb connector (or 10 mm length of PEEK tubing 1.6mm OD 0.25mm ID) on the end of the waste tube coming from the flow cell.
- 470 mm of Silicone tubing 2 mm OD 1 mm ID on the flow cell sheath inlet barb.

Step 7: Attach fluidics system to instrument
Insert the flow cell through the hole in the bottom of the base, and screw it tight with 2x M3 self-tapping posi head screws 16 mm.

Put the sample pump holder over the sample pump and fasten with 1x M3 self-tapping posi head screws 8 mm.

Thread the SIP tube into the sample loader and attach the sample loader to the base with 4x M3 self-tapping posi head screws 16 mm. Make sure the flexible tube from the SIP sits in the groove on top of the sample loader and is not pinched by fastening the sample loader.

Fasten the retaining spring with 1x M3 self-tapping posi head screws 10 mm.

If building the Cytkit 2S-14F configuration, screw on the sample pump connection board with 2x M3 self-tapping posi head screws 8 mm.

Screw on the sheath pump holder to the inside of the stand (left hand side) with 2x M3 self-tapping posi head screws 10 mm.

Connect tubing:
- Thread the sheath and waste tubing through the respective top holes in the left hand side of the stand.
- Connect the sheath tubing to the barb at the end of the sheath tank assembly.
- Connect the waste tubing to the barb hanging from the flow cell waste outlet.
- Thread the pump tubing from the waste tank through the front hole of the second row of holes in the left hand side of the stand, and connect it to the barb coming out of the vacuum pump assembly.
- If building the Cytkit 2S-14F configuration, thread the pressure sensor tubing from the waste tank through the remaining hole in the second row of holder in the left hand side of the stand.
- If building the Cytkit 1S-1F configuration, insert a 30 mm section of PEEK tubing 1.6mm OD 0.25mm ID in the waste tank vent tubing.
- Thread the dangling sheath and waste tubes through the serpentine retaining groove.

Step 8: Attach fan holder to stand
These instructions are for the Cytkit 2S-14F only:
- Insert the blower fan in its printed holder.
- Route the fan cable, the sheath pump cable and the pressure sensor tubing through the hole in the left rear of the stand to the electronics compartment behind it.
- Screw on the fan holder
- Check that the cables emerge at the rear of the stand (in the electronics compartment).

Test and check the fluidics
Make sure SIP tube reaches the bottom of a sample tube placed in the sample loader.

Make sure the sample loader goes up and down smoothly, stays stably at both the top and bottom positions, and that a sample tube can be inserted and removed easily. You may need to straighten the PEEK SIP tube by bending it in the opposite direction from whichever way it naturally curled.
You have now build the fluidics system and are ready to build the optics!